Water Tank Process Physics Simulate a simple water storage tank with the following characteristics: - Tank capacity: approximately 1 meter maximum water height - Medium-sized industrial tank (cross-section area around 1 m^2) - Gravity-driven outflow through a drain valve - Controllable inlet valve (on/off) for filling - Initial water level at 50% capacity The tank should: - Fill when the inlet valve is commanded open - Drain naturally through gravity when not filling - Maintain realistic physics (water doesn't go negative or above max) Use the physical_values keys from the HIL configuration to map: - Tank level state (output to sensors) - Inlet valve command (input from actuators) - Level measurement for sensors (output) Simulation should run at approximately 10 Hz (dt around 0.1 seconds).